Skip to content
Resources
Strategy advice
Revenue model
NPD checklist
Design scorecard
Type 1 GRR
AIAG GRR
Non normal Cpk
Binomial failure rate
Sample size – Testing
Sample size – Survey
Sample size – Inspection (Z1.4)
Contact us
eMail
Call
Menu
Resources
Strategy advice
Revenue model
NPD checklist
Design scorecard
Type 1 GRR
AIAG GRR
Non normal Cpk
Binomial failure rate
Sample size – Testing
Sample size – Survey
Sample size – Inspection (Z1.4)
Contact us
eMail
Call
Ideally, all lots with defects should be rejected.
However, due to manufacturing and measurement errors, lots with low defect levels are accepted.
Inspection plans are developed based on risk, lot size, and type of inspection.
Comparing sample size of inspection plans with same customer protection for AQL 0.4, 150,000 lot.
Click here for Z1.4 plan